Laserfiche WebLink
W <br /> WASTE MANAGEMENT <br /> INSURANCE REQUIREMENTS <br /> Throughout the term of this Agreement,the Contractor shall maintain insurance coverage written for not less than (i)the limits of <br /> insurance coverage corresponding to the Insurance Group(Low, Medium,or High) identified below,as determined by the Owner <br /> (i.e.,Waste Management), in its sole discretion,or(ii)required by law,whichever is greater. <br /> Insurance Group <br /> (Check Insurance Group below. If no Insurance Group is checked, Medium shall be used.) <br /> Required Insurance ❑ Low ® Medium ❑ High <br /> $1 M per accident $1 M per accident $1 M per accident <br /> Employers Liability $1 M disease policy limit $1 M disease policy limit $1 M disease policy limit <br /> $1 M disease per employee $1 M disease per employee $1 M disease per employee <br /> Workers Compensation Statutory Statutory Statutory <br /> Commercial General Liability& <br /> Umbrella Liability(including $21VI per occurrence $51VI per occurrence $10M per occurrence <br /> bodily injury,property damage, $21VI aggregate $51VI aggregate $10M aggregate <br /> operations,products,and <br /> completed operations) <br /> Automobile Liability(limits can <br /> be met with Umbrella Liability $1 M per occurrence $21VI per occurrence $51VI per occurrence <br /> coverage) <br /> Other Insurance Coverage check if required) <br /> ❑ Professional Liability <br /> Errors&Omissions <br /> (required only where $1 M per occurrence $21VI per occurrence $4M per occurrence <br /> engineering,architectural, $21VI aggregate $41VI aggregate $81VI aggregate <br /> or design services are <br /> provided) <br /> Insurance Groups. Owner will generally determine which Insurance Group is applicable to this Agreement according to the <br /> following definitions, provided, however, nothing in this Exhibit shall preclude Owner from setting higher or lower coverage limits <br /> or requiring or waiving any other insurance requirement. <br /> Low—This Group applies to smaller construction projects or construction work incidental to larger construction projects where the <br /> risk of injury, property damage, or environmental contamination is low. Examples of these projects include: small-scale road <br /> paving, grading, preparation of shallow foundations, installation of utilities, construction of truck scales, single-story building <br /> construction (other than MRFs and transfer stations), and activities incidental to these kinds of projects (e.g., HVAC installation, <br /> plumbing, interior modifications, etc.). Construction projects or services with contract value less than $100,000 will generally be <br /> presumed to be Low,except where the project or services present unusually high risks. <br /> Medium —This Group applies to construction projects or services where the risk of injury, property damage, or environmental <br /> contamination is typical of similar Waste Management construction projects. Examples include: landfill cell excavation and <br /> construction, final cover construction, construction of transfer stations or material recovery facilities, multi-story building <br /> construction, bridgework,work in or above waterways or wetlands, installation of leachate collection systems, and installation of <br /> gas collection systems in active landfills. <br /> High—This Group applies to construction projects or services with contract value exceeding$1 million and involving conditions or <br /> services that present unusually high risks or significant exposure to substantial liability in the event of an accident or negligence in <br /> performing the services. Projects involving significant quantities of flammable, explosive, toxic, or other hazardous materials are <br /> presumed to fall in the High Insurance Group. Examples of such projects include: blasting with explosives; construction work in <br /> and around hazardous waste disposal, storage, or treatment facilities; large-scale excavation of solid or hazardous waste; <br /> asbestos abatement;and landfill gas-to-energy turbine construction. <br /> See Additional Requirements on Page 2. <br /> Insurance Requirements 1 Jan-13 <br /> Ver.1.0 <br />