My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. SR 06-03-2019
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2019
>
06-03-2019
>
8.1. SR 06-03-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 4:05:20 PM
Creation date
5/30/2019 3:36:55 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/3/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
405
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01770-PROJECT CLOSEOUT <br /> PART 1-- GENERAL <br /> 1.1 FINAL INSPECTION <br /> A. After the cleaning up of the work, premises,and all other areas and structures connected with the <br /> performance of the contract,the work as a whole, shall be examined by the Engineer and Owner; and,any <br /> workmanship or materials found not meeting the requirements of the specifications shall be identified and <br /> included on a punch list given to the Contractor. <br /> B. The Contractor shall,at its own expense, promptly remove, replace, repair,or otherwise correct the <br /> deficiencies with good and satisfactory workmanship and material to the satisfaction of the Owner and <br /> Engineer. <br /> C. In the event that the Contractor does not satisfactorily remove, replace, repair,or otherwise correct the <br /> deficiencies within thirty calendar days after receipt of the punch list,the Owner reserves the right to <br /> employ the services of other contractors and/or service organizations to conduct the necessary work and <br /> deduct any and all associated costs from final payment to the Contractor. The entry of such other agents <br /> on the project to perform this work will not relieve the Contractor from any of its warranty, maintenance or <br /> start-up obligations. <br /> 1.2 PROJECT ACCEPTANCE <br /> A. The project shall be accepted after the final examination has been conducted and all settlement,defects, <br /> damages,etc.,discovered during the previous examination have been remedied. <br /> PART 2-- PRODUCTS(NOT USED) <br /> PART 3-- EXECUTION(NOT USED) <br /> **** END OF SECTION **** <br /> Elk River Landfill, Inc. -R16.115896 PROJECT CLOSEOUT <br /> March 2019 PAGE 01770-1 <br /> V040110©Bolton&Menk,Inc.2018,All Rights Reserved <br />
The URL can be used to link to this page
Your browser does not support the video tag.