Laserfiche WebLink
constitute acceptance of all site conditions,and any required removal, repair or replacement caused by <br /> unsuitable conditions shall be performed by the Contractor at his sole cost and expense. <br /> 1.5 RIGHT OF REJECTION <br /> A. The Engineer,acting for the Owner,shall have the right,at all time and places,to reject any articles or <br /> materials to be furnished hereunder which in any respect,fail to meet the requirements of these <br /> specifications, regardless of whether the defects in such articles or materials are detected at the point of <br /> manufacture or after completion of the work at the site. If the Engineer or RPR,through an oversight or <br /> otherwise, has accepted materials or work which is defective or which is contrary to the specifications,such <br /> material, no matter in what stage or condition of manufacture,deliver,or erection, may be rejected by the <br /> Engineer for the Owner. <br /> PART 2-- PRODUCTS(NOT USED) <br /> PART 3-- EXECUTION(NOT USED) <br /> ****END OF SECTION**** <br /> Elk River Landfill, Inc. -R16.115896 QUALITY CONTROL <br /> March 2019 PAGE 01450-2 <br /> V040110©Bolton&Menk,Inc.2018,All Rights Reserved <br />