My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. SR 06-03-2019
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2019
>
06-03-2019
>
8.1. SR 06-03-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 4:05:20 PM
Creation date
5/30/2019 3:36:55 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/3/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
405
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01310-COORDINATION <br /> PART 1-- GENERAL <br /> 1.1 SEQUENCE OF CONSTRUCTION <br /> A. A suggested Construction Sequence is outlined in Section 01350 of these specifications. <br /> B. A written project management scheduling tool (i.e.,critical path (CPM),detailed bar chart,etc.)shall be <br /> employed by the Contractor for cost value reporting, planning and scheduling of all work required under <br /> the Contract Documents. This schedule shall show the order in which the Contractor proposes to execute <br /> the work with dates on which it proposes to start the various phases of the work and the estimated <br /> completion date of each phase.The Contractor shall submit a preliminary version of its intended schedule <br /> within 10 working days following the Notice of Award on the attached form or on a form of its own <br /> choosing. The Contractor is required to show the initial critical path(CPM)of tasks to be performed. <br /> C. Unless otherwise approved by the Engineer,the schedule shall also include an anticipated payment <br /> schedule for the volume of work to be completed each month.This schedule shall indicate the Contractor's <br /> intention and ability to complete the work within the contract times,as specified in Article 4 of Section <br /> 00520"Agreement"of this Project Manual. <br /> D. The Preconstruction Conference as outlined in Section 01315"Project Meetings"of this Project Manual will <br /> not be conducted until the schedule is submitted. In addition, no construction staking shall be provided <br /> until the schedule is submitted by the Contractor and reviewed by the Engineer. <br /> 1.2 WORKING HOURS <br /> A. Contractors operations shall be limited to the hours of 7:00 a.m.to 7:00 p.m., Monday through Friday, <br /> unless prior arrangements are made with the Owner. <br /> 1.3 TRAFFIC CONTROL <br /> A. Reference Specification 01555 "Maintenance and Control of Traffic"of this Project Manual. <br /> 1.4 COORDINATION WITH UTILITY COMPANIES <br /> A. The Contractor is responsible for working with public and private utility companies in protecting and/or <br /> relocating existing or new utility lines located near and affected by this construction. The Contractor is <br /> responsible for coordinating the extension of electric and gas utilities into the Lift Station Site. <br /> B. The Contractor shall consult with the City's maintenance personnel when working around or performing the <br /> required sanitary sewer installations. <br /> PART 2-- PRODUCTS(NOT USED) <br /> PART 3-- EXECUTION(NOT USED) <br /> ****END OF SECTION**** <br /> Elk River Landfill, Inc. - R16.115896 COORDINATION <br /> March 2019 PAGE 01310-1 <br /> V040110©Bolton&Menk,Inc.2018,All Rights Reserved <br />