My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3. SR 06-13-2005
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2005
>
06/13/2005
>
5.3. SR 06-13-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:35:16 AM
Creation date
6/10/2005 9:20:25 AM
Metadata
Fields
Template:
City Government
type
SR
date
6/13/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SHERBURNE COUNTY <br />ROAD TURNBACK POLICY <br /> <br />The County of Sherburne shall build the road to the County's design based upon the <br />following: <br /> <br />· ADTs; <br />· Soils (determination of the need for a seven ton versus a nine ton road); and, <br />· Functional classification of the road under the Sherburne County Highway Plan. <br /> <br />If the proposed road project can be fully paid for from sources other than the county <br />revenues, then the County Board reserves the right to deviate from this policy. <br /> <br />In the alternative, the County may elect to pay to the City or the Township, with the <br />latter's agreement, the sum equivalent to the Sherburne County Engineer's adopted cost <br />estimate for building the road and the City or Township agree to build the road. The <br />County shall, as required by statute, maintain the road for the statutorily required period. <br /> <br />Adopted this <br /> <br />day of <br /> <br />,20 <br /> <br />Felix Schmiesing, Board Chair <br /> <br />Brian Bensen, Administrator <br /> <br />Date <br /> <br />Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.