Laserfiche WebLink
<br />SHERBURNE COUNTY <br />ROAD TURNBACK POLICY <br /> <br />The County of Sherburne shall build the road to the County's design based upon the <br />following: <br /> <br />· ADTs; <br />· Soils (determination of the need for a seven ton versus a nine ton road); and, <br />· Functional classification of the road under the Sherburne County Highway Plan. <br /> <br />If the proposed road project can be fully paid for from sources other than the county <br />revenues, then the County Board reserves the right to deviate from this policy. <br /> <br />In the alternative, the County may elect to pay to the City or the Township, with the <br />latter's agreement, the sum equivalent to the Sherburne County Engineer's adopted cost <br />estimate for building the road and the City or Township agree to build the road. The <br />County shall, as required by statute, maintain the road for the statutorily required period. <br /> <br />Adopted this <br /> <br />day of <br /> <br />,20 <br /> <br />Felix Schmiesing, Board Chair <br /> <br />Brian Bensen, Administrator <br /> <br />Date <br /> <br />Date <br />