My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. BASR 05-28-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Board of Adjustments
>
BOA Packets
>
2010-2019
>
2019
>
05-28-2019
>
5.1. BASR 05-28-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2019 9:09:34 AM
Creation date
5/21/2019 9:06:50 AM
Metadata
Fields
Template:
City Government
type
BASR
date
5/28/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRTD. GLU-LAM2x10 FLR. JSTS.@ 16" O.C.5/4" DECKINGSCREWEDAPPLY SCREENUNDER DECKING6x6 WOODPOSTS6x6 WOOD POST ON20" Ø x 48" DEEPCONC. PIER FTG.2x10 FLR. JSTS.@ 16" O.C.5/4" DECKINGSCREWED2-11 7/8" MLH 124 128SUB FLOOR @EXISTING HOUSE9'-5 7/8" <br />4"9'-1 7/8"1'-6"14'-0"10'-0"1'-6"9'-5" <br />3'-0"T&G WOOD CLG.BUILDING SECTIONSEE BUILDERS SPECIFICATION FOR BUILDING MATERIALS3/8"=1'-0"OF44Y:\Drawings\2019 Drawing\19.055 LILESTRAND\LILLESTRAND 6.dwg, 4/17/2019 7:44:35 AM, DWG To PDF.pc3
The URL can be used to link to this page
Your browser does not support the video tag.