SCHEDULE 3-DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br /> to Minnesota Technical Requirements. Commissioning tests of the Interconnection <br /> Customer's installed equipment shall be performed pursuant to applicable codes and <br /> standards of Minnesota's Technical Requirements and Section 15. <br /> The Interconnection Customer shall notify the Area EPS Operator of testing and <br /> inspection no fewer than five (5) Business Days in advance, or as may be agreed to by <br /> the Parties. Depending on the process track, either a Certificate of Completion or a <br /> testing procedure shall be submitted to the Area EPS Operator prior to the testing and <br /> inspection date.The Area EPS Operator shall send qualified personnel to the DER site <br /> to inspect the interconnection and witness the testing. Testing and inspection shall <br /> occur on a Business Day at a mutually agreed upon time and date. The Area EPS <br /> Operator may waive the right to witness the testing. <br /> 9.3. Interconnection Costs <br /> The Interconnection Customer shall pay for the actual cost of the Interconnection <br /> Facilities and Distribution Upgrades along with the Area EPS Operator's cost to <br /> commission the proposed DER system. An estimate of the interconnection costs shall <br /> be stated in the Uniform Contract or MMIA. <br /> 9.4. Technical Requirements <br /> The Area EPS Operator shall use Reasonable Efforts to provide the Interconnection <br /> Customer the Minnesota Technical Requirements by providing the document with the <br /> notice of approval of the interconnection application or by providing a website link to <br /> the document. Additionally, the Area EPS Operator shall notify the Interconnection <br /> Customer of any changes to these requirements as soon as they are known. Unless <br /> notified by the Area EPS Operator, the Interconnection Customer only needs to be in <br /> compliance with the current version of the Minnesota Technical Requirements at the <br /> time of interconnection. <br /> 9.5. Authorization for Parallel Operations <br /> The Interconnection Customer shall not operate its DER system in parallel with the <br /> Area EPS Operator's distribution system without prior written authorization from the <br /> Area EPS Operator.The Area EPS Operator shall provide such authorization within <br /> three (3) Business Days from when the Area EPS Operator receives notification that the <br /> Interconnection Customer has complied with all applicable parallel operations <br /> requirements; the completion of a successful testing and inspection of the DER system <br /> and all payments for issued bills related to the interconnection process that are past <br /> due have been paid in full. Such authorization shall not be unreasonably withheld, <br /> conditioned or delayed. <br /> 14 <br /> 149 <br />