My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.8. ERMUSR 05-14-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
05-14-2019
>
2.8. ERMUSR 05-14-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2019 12:09:04 PM
Creation date
5/10/2019 12:07:47 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/14/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3-DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br /> limited capacity. The Area EPS Operator's agreement shall not be unreasonably <br /> withheld provided proper documentation is provided showing the effective limit active <br /> power output will not adversely affect the safety and reliability of the Area EPS <br /> Operator's distribution system. If the Area EPS Operator does not agree, the <br /> Interconnection Application must be withdrawn or revised to specify the maximum <br /> capacity that the DER system is capable of injecting into the Area EPS Operator's <br /> distribution system without such limitations. Nothing in this section shall prevent the <br /> Area EPS Operator from considering a higher output, (i.e. aggregate Nameplate Rating), <br /> if the limitations do not provide adequate assurance, when evaluating the system <br /> impacts. <br /> 7 Modification to Interconnection Applications <br /> 7.1. Procedures <br /> At any time after the Interconnection Application is deemed complete, the <br /> Interconnection Customer or the Area EPS Operator may identify modifications to the <br /> proposed DER system that may improve costs and benefits (including reliability) of the <br /> proposed DER system and the ability for the Area EPS Operator to accommodate the <br /> proposed DER system. The Interconnection Customer shall submit to the Area EPS <br /> Operator in writing all proposed modifications to any information provided in the <br /> Interconnection Application. The Area EPS Operator cannot unilaterally modify the <br /> Interconnection Application. <br /> Additional information regarding modifications to interconnection applications is found <br /> in each process track document. <br /> 8 Interconnection Agreements <br /> 8.1. Timelines <br /> After the Interconnection Application has been approved by the Area EPS Operator, the <br /> Area EPS Operator shall provide the Interconnection Customer with an executable <br /> Interconnection Agreement within five (5) Business Days. The Interconnection <br /> Customer shall have thirty(30) Business Days to sign and return the Interconnection <br /> Agreement to the Area EPS Operator. The Area EPS Operator shall sign the <br /> Interconnection Agreement within five (5) business days after receiving the signed <br /> Interconnection Agreement from the Interconnection Customer. <br /> If the Interconnection Customer fails to return a signed Interconnection Agreement to <br /> the Area EPS Operator within thirty (30) Business Days and fails to request an extension <br /> as explained in Section 10, the Interconnection Application will be deemed withdrawn. <br /> 12 <br /> 147 <br />
The URL can be used to link to this page
Your browser does not support the video tag.