My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.8. ERMUSR 05-14-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
05-14-2019
>
2.8. ERMUSR 05-14-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2019 12:09:04 PM
Creation date
5/10/2019 12:07:47 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/14/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
qualifying facility. In either case,the utility(and,as applicable,the utility's wholesale <br /> supplier) and the owner of the qualifying facility will cooperate in the transition from the <br /> form of contract set forth in the utility's Rules Governing Interconnection of Cogeneration <br /> and Small Power Production to a new form of contract appropriate to a qualifying facility <br /> with a capacity of 40 kW or greater. <br /> 18. Fully executed interconnection contracts for distributed energy resources may be <br /> canceled in the event the distributed energy resource fails to interconnect to the utility's <br /> distribution system within twelve (12) months of signing of the interconnection contract <br /> by the qualifying facility and the utility. <br /> 4 <br /> 65 <br />
The URL can be used to link to this page
Your browser does not support the video tag.