Laserfiche WebLink
SCHEDULE 3-DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br /> 5.2. Information Provided 9 <br /> 5.3. Pre-Application Report Components 10 <br /> 6 Capacity of the Distributed Energy Resources 11 <br /> 6.1. Existing DER System Expansion 11 <br /> 6.2. New DER Systems 11 <br /> 6.3. Limited Capacity 11 <br /> 7 Modification to Interconnection Applications 12 <br /> 7.1. Procedures 12 <br /> 8 Interconnection Agreements 12 <br /> 8.1. Timelines 12 <br /> 8.2. Types of Agreements 13 <br /> 9 Interconnection 13 <br /> 9.1. Metering 13 <br /> 9.2. Inspection,Testing and Commissioning 13 <br /> 9.3. Interconnection Costs 14 <br /> 9.4. Technical Requirements 14 <br /> 9.5. Authorization for Parallel Operations 14 <br /> 10 Extension of Timelines 15 <br /> 10.1. Reasonable Efforts 15 <br /> 10.2. Extensions 15 <br /> 11 Disputes 15 <br /> 11.1. Procedures 15 <br /> 12 Clauses 15 <br /> 12.1. Confidentiality 15 <br /> 12.2. Non-Warranty 17 <br /> 12.3. Indemnification 17 <br /> 12.4. Limitation of Liability 18 <br /> 13 Glossary 19 <br /> 14 Certification of DER Equipment 25 <br /> 15 Certification Codes and Standards 27 <br /> ii <br /> 135 <br />