Laserfiche WebLink
SCHEDULE 2-STANDARD CONTRACTS <br /> Attachment V: Additional Operating and Maintenance Requirements <br /> for the Area EPS Operator's Distribution System and Affected Systems <br /> Need to Support the Interconnection Customer's Needs <br /> The Area EPS Operator shall also provide requirements that must be met by the <br /> Interconnection Customer prior to initiating parallel operation with the Area EPS Operator's <br /> Distribution System. Additional operating and maintenance requirements for an Affected <br /> System needed to support the Interconnection Customer's needs may be addressed in a <br /> separate agreement described in Section 14.6. <br /> Municipal Minnesota Interconnection Agreement_ January 2019 35 <br /> 126 <br />