Laserfiche WebLink
SCHEDULE 2-STANDARD CONTRACTS <br /> 3 Parallel Operation Obligations <br /> 3.1. Once the Distributed Energy Resource has been authorized to commence parallel <br /> operation, the Interconnection Customer shall abide by all rules and procedures <br /> pertaining to the parallel operation of the Distributed Energy Resource in the <br /> applicable control area, including, but not limited to; 1) the rules and procedures <br /> concerning the operation of generation set forth by the applicable system <br /> operator(s) for the Area EPS Operator's Distribution System provided or referenced <br /> in an attachment to this Agreement and; 2)the Operating Requirements set forth in <br /> Attachment 5 of this Agreement. The Minnesota Technical Requirements for <br /> interconnection are covered in a separate document, a copy of which has been <br /> made available to the Interconnection Customer and incorporated and made part of <br /> this Agreement by this reference. <br /> 4 Metering <br /> 4.1. As described in M-MIP Overview Process Section 9.1, the Interconnection Customer <br /> shall be responsible for the Area EPS Operator's reasonable and necessary cost for <br /> the purchase, installation, operation, maintenance, testing, repair, and replacement <br /> of metering and data acquisition equipment specified in Attachments 2 and 3 of this <br /> Agreement. The Interconnection Customer's metering (and data acquisition, as <br /> required) equipment shall conform to applicable industry rules and Operating <br /> Requirements. <br /> 5 Distributed Energy Resource Capabilities and Grid Reliability <br /> 5.1. The Minnesota Technical Requirements outlines the Parties responsibilities <br /> consistent with IEEE 1547 Standard for Interconnection and Interoperability of <br /> Distributed Energy Resources with Associated Electric Power Systems Interfaces <br /> which provides requirements relevant to the interconnection and interoperability <br /> performance, operation and testing, and, to safety, maintenance and security <br /> considerations. <br /> 5.2. The Area EPS Operator may offer the Interconnection Customer the option to utilize <br /> required DER capabilities to mitigate Interconnection Customer costs related to <br /> Upgrades or Interconnection Facilities to address anticipated system impacts from <br /> the engineering review (i.e. Initial Review, Supplemental Review, or Study Process <br /> described in the M-MIP.) <br /> Municipal Minnesota Interconnection Agreement_January 2019 4 <br /> 95 <br />