Laserfiche WebLink
8. The QF will operate its electric generating facilities so that they conform to the <br /> national, state, and local electric and safety codes, and will be responsible for the <br /> costs of conformance. <br /> 9. The QF is responsible for the actual, reasonable costs of interconnection which are <br /> estimated to be $ . The QF will pay the Utility in this way: <br /> • <br /> 10. The QF will give the Utility reasonable access to its property and electric generating <br /> facilities if the configuration of those facilities does not permit disconnection or <br /> testing from the Utility 's side of the interconnection. If the Utility enters the QF's <br /> property, the Utility will remain responsible for its personnel. <br /> 11. The Utility may stop providing electricity to the QF during a system emergency. The <br /> Utility will not discriminate against the QF when it stops providing electricity or <br /> when it resumes providing electricity. <br /> 12. The Utility may stop purchasing electricity from the QF when necessary for the <br /> Utility to construct, install, maintain, repair, replace, remove, investigate, or inspect <br /> any equipment or facilities within its electric system. The Utility may stop <br /> purchasing electricity from the QF in the event the generating facilities listed in this <br /> contract are documented to be causing power quality, safety or reliability issues to <br /> the Utility's electric distribution system. <br /> The Utility will notify the QF before it stops purchasing electricity in this way: <br /> 13. The QF will keep in force general liability insurance against personal or property <br /> damage due to the installation, interconnection, and operation of its electric <br /> generating facilities. The amount of insurance coverage will be $ <br /> (The amount must be consistent with the distributed generation tariff adopted by <br /> the Utility pursuant to Minnesota Statutes §216B.1611, subdivision 3, clause 2.) <br /> 14. The QF and the Utility agree to attempt to resolve all disputes arising hereunder <br /> promptly and in a good faith manner. <br /> 15. The city council or city-appointed body governing the Utility has authority to <br /> consider and determine disputes, if any, that arise under this contract in <br /> accordance with procedures in the rules it adopts implementing Minnesota Statute <br /> §216B.164, pursuant to §216B.164, subdivision 9. <br /> 77 <br />