My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.8. ERMUSR 05-14-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
05-14-2019
>
2.8. ERMUSR 05-14-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2019 12:09:04 PM
Creation date
5/10/2019 12:07:47 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/14/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3-DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br /> Attachment A <br /> Assumptions Used in Conducting the System Impact Study <br /> The System Impact Study shall be based upon the following assumptions: <br /> 1) Designation of Point of Common Coupling and configuration to be studied. <br /> 2) Designation of alternative Points of DER Interconnection and configuration. <br /> 1) and 2) are to be completed by the Interconnection Customer. Other assumptions (attached <br /> to this Agreement) are to be provided by the Interconnection Customer and the Area EPS <br /> Operator.The Area EPS Operator shall use the Reference Point for Applicability which is either <br /> the Point of Common Coupling or the Point(s) of DER Interconnection as described in IEEE 1547. <br /> Additional DER Technical Data Required for System Impact Study <br /> If applicable,the Area EPS Operator shall provide a list of any additional technical data that is <br /> required to adequately perform the System Impact Study. This list of required technical data <br /> shall be attached to this Agreement. As indicated in Section 4 of the Study Process document of <br /> the M-MIP, this information is to be returned with the signed System Impact Study Agreement <br /> and deposit. <br /> Data to Be Provided by the Area EPS Operator with the System Impact Study Agreement <br /> Estimate Cost of System Impact Study $ <br /> Time duration to complete System Impact Study Business Days <br /> M-MIP System Impact Study Agreement_January 2019 8 <br /> 251 <br />
The URL can be used to link to this page
Your browser does not support the video tag.