My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.8. ERMUSR 05-14-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
05-14-2019
>
2.8. ERMUSR 05-14-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2019 12:09:04 PM
Creation date
5/10/2019 12:07:47 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/14/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3-DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br /> Supplemental Review Offer <br /> The Distributed Energy Resource(DER)Interconnection Application in the name of (Interconnection <br /> Customer) for a DER system described as (description of DER System) <br /> and proposed to be located at (Address or Legal Description) <br /> has failed one or more of the initial engineering screens.To continue with the Interconnection Process,the <br /> Interconnection Customer may choose to continue with a Supplemental Review or may choose the <br /> Interconnection Application to be evaluated under the Study Process track.The Interconnection Customer has <br /> fifteen (15) Business Days to indicate to the Area Electrical Power System (EPS)Operator,the next step in the <br /> Interconnection Process and return this Supplemental Review Offer or the Interconnection Application will only <br /> continue to be evaluated under the Study Process track or be deemed withdrawn. <br /> Interconnection Customer agrees that the Area EPS Operator shall: <br /> Proceed with a Supplemental Review of the Interconnection Application. <br /> Continue evaluation of the Interconnection Application under the Study Process track. <br /> Deem the Interconnection Application withdrawn. <br /> If the Interconnection Customer chooses to proceed with the Supplemental Review,the Interconnection Customer <br /> shall note the order in which the Supplemental Review screens should be performed and indicate the action the <br /> Area EPS Operator should take if a Supplement Review screen has failed. <br /> Supplemental Order to Cost Estimate of <br /> Review Screen Perform Screens Review Screen <br /> Minimum Load <br /> Voltage& Power Quality <br /> Safety& Reliability <br /> Total Deposit Required <br /> Upon failure of a Supplemental Review screen or upon notification the Area EPS Operator is unable to complete a <br /> Supplemental Review screen,the Interconnection Customer agrees that the Area EPS Operator shall: <br /> Proceed with the remaining Supplemental Review screens. <br /> Stop the Supplemental Review screens and continue evaluation of the Interconnection Application under <br /> the Study Process track. <br /> Stop the Supplemental Review screens and contact the Interconnection Customer for further instructions. <br /> Deem the Interconnection Application withdrawn. <br /> M-MIP Supplemental Review Offer January 2019 <br /> 241 <br />
The URL can be used to link to this page
Your browser does not support the video tag.