My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.8. ERMUSR 05-14-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
05-14-2019
>
2.8. ERMUSR 05-14-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2019 12:09:04 PM
Creation date
5/10/2019 12:07:47 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/14/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
all dispute responsibilities as listed in existing interconnection contracts. Disputes are resolved in <br /> accordance with Part T. <br /> Subp. 3. Renewable energy credits; ownership. Generators own all renewable energy credits unless <br /> other ownership is expressly provided for by a contract between a generator and the utility. <br /> Part V. UNIFORM CONTRACT <br /> The form for uniform contract that shall be used between the utility and a qualifying facility <br /> having less than 40 kilowatts of capacity is as shown in subpart 1. <br /> Subpart 1. Uniform Contract for Cogeneration and Small Power Production Facilities. (See attached <br /> contract form.) <br /> 8 <br /> 74 <br />
The URL can be used to link to this page
Your browser does not support the video tag.