Laserfiche WebLink
SCHEDULE 3-DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br /> Interconnection Facilities Information <br /> Will a transformer be used between the DER and the Point of ❑ Yes ❑ No <br /> Common Coupling? <br /> Will the transformer be provided by the Interconnection Customer? ❑ Yes ❑ No <br /> If yes, please fill in the fields below. <br /> Proposed location of protective interface equipment on property: <br /> Transformer Data (For Interconnection Customer-Owned Transformer) <br /> What is the phase configuration of the transformer? 0 Single Phase 0 Three Phase <br /> Size (kVA): Transformer Impedance (%): On kVA Base: <br /> Transformer Volts: Delta: Wye: Wye Grounded: <br /> (Primary) <br /> Transformer Volts: Delta: Wye: Wye Grounded: <br /> (Secondary) <br /> Transformer Volts: Delta: Wye: Wye Grounded: <br /> (Tertiary) <br /> Transformer Fuse Data (For Interconnection Customer-Owned Fuse) <br /> Manufacturer: Type: Size: Speed: <br /> Interconnecting Circuit Breaker (For Interconnection Customer-Owned Circuit Breaker) <br /> Manufacturer: Type: <br /> Load Rating (in Amps): Interrupting Rating (In Amps): Trip Speed (Cycles): <br /> Interconnection Protective Relays (For Microprocessor Controlled Relays) <br /> Setpoint Function Minimum Maximum <br /> ELK RIVER MUNICIPAL UTILITIES 7 <br /> 235 <br />