My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.8. ERMUSR 05-14-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
05-14-2019
>
2.8. ERMUSR 05-14-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2019 12:09:04 PM
Creation date
5/10/2019 12:07:47 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/14/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3-DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br /> 2.2. Professional Licensed Engineer Signature <br /> The one-line diagram submitted with the Interconnection Application will require a <br /> signature from a professional engineer licensed in the State of Minnesota certifying the <br /> DER was designed in conformance to the Minnesota Technical Requirements for the <br /> following conditions: <br /> • Certified1 equipment is greater than 250 kW. <br /> • Non-certified equipment is greater than 20 kW. <br /> 2.3. Battery Storage <br /> An inverter-based DER system may include battery storage. DER systems that include <br /> battery storage should complete the Energy Storage Application along with the <br /> Interconnection Application. <br /> 2.4. Site Control <br /> Documentation of site control must be submitted with the Interconnection Application. <br /> Site control may be demonstrated by any of the following: <br /> • Ownership of, a leasehold interest in, or a right to develop a site for the purpose of <br /> constructing the DER system; <br /> • An option to purchase or lease a site for constructing the DER system; <br /> • An exclusivity or other business relationship between the Interconnection Customer <br /> and the entity having the right to sell, lease, or grant the Interconnection Customer <br /> the right to possess or occupy a site for constructing the DER system. <br /> 2.5. Interconnection Applications from Other Processes <br /> Some Interconnection Applications submitted under the Fast Track Process may be <br /> moved into the Study Process due to issues with the DER interconnection identified by <br /> engineering screens. An Area EPS Operator cannot request a new Interconnection <br /> Application submission if the Interconnection Application has already been submitted <br /> through the Fast Track Process. The Interconnection Customer who had already paid a <br /> processing fee for the Fast Track Process is still responsible to make a deposit toward <br /> the applicable studies address in Section 4, 5 and 6, but does not need to submit an <br /> additional processing fee. <br /> 1 Additional information regarding certified equipment is found in Sections 14 and 15 of the Process Overview <br /> document. <br /> 2 <br /> 204 <br />
The URL can be used to link to this page
Your browser does not support the video tag.