SCHEDULE 3-DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br /> Contents <br /> 1 Applicability 1 <br /> 1.1. Applicability 1 <br /> 1.2. Codes, Standards and Certification Requirements 1 <br /> 2 Application Submission 1 <br /> 2.1. Initial Interconnection Application for the Study Process 1 <br /> 2.2. Professional Licensed Engineer Signature 2 <br /> 2.3. Battery Storage 2 <br /> 2.4. Site Control 2 <br /> 2.5. Interconnection Applications from Other Processes 2 <br /> 3 Initial Steps 3 <br /> 3.1. Completeness Review and Queue Position 3 <br /> 3.2. Scoping Meeting 3 <br /> 4 System Impact Study 4 <br /> 4.1. Electric System Impacts 4 <br /> 4.2. System Impact Study Agreement 4 <br /> 4.3. System Impact Study Costs 4 <br /> 4.4. System Impact Study Timelines 4 <br /> 5 Transmission System Impact Study 5 <br /> 5.1. Transmission System Impacts 5 <br /> 5.2. Transmission System Impact Study Timelines 6 <br /> 5.3. Regional Transmission Operator Jurisdiction 6 <br /> 6 Facilities Study 6 <br /> 6.1. Construction of Facilities 6 <br /> 6.2. Facilities Study Agreement 6 <br /> 6.3. Facilities Study Timeline 7 <br /> 6.4. Identification of Construction of Facilities 7 <br /> 6.5. Facilities Study Report Timeline 8 <br /> 7 Interconnection Agreement 9 <br /> 7.1. Uniform Contract 9 <br /> 201 <br />