My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.8. ERMUSR 05-14-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
05-14-2019
>
2.8. ERMUSR 05-14-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2019 12:09:04 PM
Creation date
5/10/2019 12:07:47 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/14/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3-DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br /> 8.2. Timelines <br /> Within ten (10) Business Days of receipt of the proposed modification, the Area EPS <br /> Operator shall evaluate whether the proposed modification to the Interconnection <br /> Application constitutes a Material Modification. The definition in the Section 13 <br /> Glossary of the Process Overview document includes examples of what does and does <br /> not constitute a Material Modification. <br /> The Area EPS Operator shall notifythe Interconnection Customer in writing of the final <br /> p <br /> determination of the proposed modification. For proposed modifications that are <br /> determined to be a Material Modification the Interconnection Customer may choose to <br /> either: 1) withdraw the proposed modification; or 2) proceed with a new <br /> Interconnection Application. The Interconnection Customer shall provide its <br /> determination in writing to the Area EPS Operator within ten (10) Business Days after <br /> being provided the Material Modification determination. If the Interconnection <br /> Customer does not provide its determination within the timeline, the Interconnection <br /> Application shall be considered withdrawn. <br /> If the proposed modification is not determined to be a Material Modification, then the <br /> Area EPS Operator shall notify the Interconnection Customer in writing that the <br /> modification has been accepted and the Interconnection Customer shall retain its <br /> eligibility for interconnection, including its place in the queue. <br /> 9 Interconnection <br /> 9.1. Interconnection Milestones <br /> For DER systems that are not a qualifying facility less than 40 kW AC, the <br /> Interconnection Customer and the Area EPS Operator shall agree on milestones for <br /> which each Party is responsible and list them in Attachment IV of the MMIA. To the <br /> greatest extent possible, the Parties will identify all design, procurement, installation <br /> and construction requirements associated with the project, and clear associated <br /> timelines, at the beginning of the design, procurement, installation and construction <br /> phase, or as early within the process as possible. <br /> A Party's obligation under this provision may be extended by agreement. If a Party <br /> anticipates that it will be unable to meet a milestone for any reason other than a Force <br /> Majeure Event, it shall immediately notify the other Party of the reason(s) for not <br /> meeting the milestone, propose the earliest reasonable alternative date in which this <br /> and future milestones will be met, and request appropriate amendments to the MMIA <br /> and its attachments.The Party affected by the failure to meet a milestone shall not <br /> unreasonably withhold agreement to such an amendment unless: <br /> 14 <br /> 194 <br />