My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.8. ERMUSR 05-14-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
05-14-2019
>
2.8. ERMUSR 05-14-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2019 12:09:04 PM
Creation date
5/10/2019 12:07:47 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/14/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3-DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br /> Unless the Interconnection Customer provides instruction for how to respond to a <br /> failure of any of the supplemental review screens in the written acceptance of <br /> supplemental review, the Area EPS Operator shall notify the Interconnection Customer <br /> within two (2) Business Days if a supplemental review screen is failed or if the Area EPS <br /> Operator is unable to perform the supplemental review screen. The Area EPS Operator <br /> shall then obtain the Interconnection Customer's permission to either: <br /> • Continue evaluating the proposed interconnection using the supplemental <br /> review screens in Section 4.4. <br /> • Terminate the supplemental review and continue evaluating the <br /> Interconnection Application in the Study Process track. <br /> • Terminate the supplemental review upon withdrawal of the Interconnection <br /> Application by the Interconnection Customer. <br /> The Interconnection Customer shall respond with its choice within five (5) Business <br /> Days of notification from the Area EPS Operator. <br /> 4.4. Supplemental Review Screens <br /> The three supplemental review screens are the Minimum Load screen, the Voltage and <br /> Power Quality screen and the Safety and Reliability screen. <br /> 4.4.1. Minimum Load Screen <br /> The aggregate DER capacity on the line section is less than 100%of the <br /> minimum load for all line sections bounded by automatic sectionalizing <br /> devices upstream of the proposed DER. If minimum load data is not available, <br /> or cannot be calculated, estimated or determined, the Area EPS Operator <br /> shall include the reason(s)that it is unable to calculate, estimate or determine <br /> minimum load in its supplemental review results notification under Section <br /> 4.3. The line section minimum load data shall include onsite load but not <br /> station service load served by the proposed DER in this screen. <br /> The type of generation used by the proposed DER will be considered when <br /> calculating, estimating, or determining circuit or line section minimum load <br /> relevant for the application of this screen. Solar photovoltaic (PV) generation <br /> systems with no battery storage use daytime minimum load (i.e., 10 a.m. to 4 <br /> p.m. for fixed panel systems and 8 a.m. to 6 p.m. for PV systems utilizing <br /> tracking systems), while all other generation uses absolute minimum load. <br /> 8 <br /> 188 <br />
The URL can be used to link to this page
Your browser does not support the video tag.