Laserfiche WebLink
SCHEDULE 3-DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br /> Table 2.1. Interconnection Application Process Fee <br /> Equipment Type Process Fee <br /> Certified System $100+$1/kW <br /> Non-Certified System $100+$2/kW <br /> 2.4. Battery Storage <br /> An inverter-based DER system may include battery storage. DER systems that include <br /> battery storage should complete the Energy Storage Application along with the <br /> Interconnection Application. <br /> 2.5. Site Control <br /> Documentation of site control must be submitted with the Interconnection Application. <br /> Site control may be demonstrated by any of the following: <br /> • Ownership of, a leasehold interest in, or a right to develop a site for the purpose of <br /> constructing the DER system. <br /> • An option to purchase or acquire a leasehold site for constructing the DER system. <br /> • An exclusivity or other business relationship between the Interconnection <br /> Customer and the entity having the right to sell, lease, or grant the <br /> Interconnection Customer the right to possess or occupy a site for constructing the <br /> DER system. <br /> 3 Application Review <br /> 3.1. Timelines <br /> The Interconnection Application shall be date- and time-stamped upon initial, and if <br /> necessary, resubmission receipt. The Interconnection Customer shall be notified of <br /> receipt by the Area EPS Operator within ten (10) Business Days of receipt of the <br /> Interconnection Application. <br /> The Area EPS Operator shall notify the Interconnection Customer if the Interconnection <br /> Application is deemed incomplete within ten (10) Business Days and provide a written <br /> list detailing all information that must be provided to complete the Interconnection <br /> Application.The Interconnection Customer has ten (10) Business Days to provide the <br /> missing information unless additional time is requested with valid reasons. Failure to <br /> submit the requested information within the stated timeline will result in the <br /> Interconnection Application being deemed withdrawn.The Area EPS Operator has an <br /> 3 <br /> 183 <br />