My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.8. ERMUSR 05-14-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
05-14-2019
>
2.8. ERMUSR 05-14-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2019 12:09:04 PM
Creation date
5/10/2019 12:07:47 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/14/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3-DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br /> twenty-one (21) Business Days of receipt, or as otherwise stated in the Uniform <br /> Contract. <br /> The Area EPS Operator does not give any warranty, expressed or implied, as to the <br /> adequacy, safety, or other characteristics of any structures, equipment, wires, <br /> appliances or devices owned, operated, installed or maintained by the Interconnection <br /> Customer, including without limitation the DER and any structures, equipment, wires, <br /> appliances or devices not owned, operated or maintained by the Area EPS Operator. <br /> 8.5. Authorization for Parallel Operation <br /> The Interconnection Customer shall not operate its DER system in parallel with the <br /> Area EPS Operator's Distribution System without prior written authorization from the <br /> Area EPS Operator.The Area EPS Operator shall provide such authorization within <br /> three (3) Business Days from when the Area EPS Operator receives the Certificate of <br /> Completion and notification the Interconnection Customer has complied with all <br /> applicable parallel operations requirements. Such authorization shall not be <br /> unreasonably withheld, conditioned or delayed. <br /> 8.6. Continual Compliance <br /> The Interconnection Customer shall be fully responsible for operating, maintaining, and <br /> repairing the DER as required to ensure that it complies at all times with the <br /> interconnection standards to which it has been certified. The Interconnection <br /> Customer shall also operate its DER system in compliance with the Area EPS Operator's <br /> technical requirements as referred to in the executed Uniform Contract or MMIA. The <br /> Area EPS Operator may periodically inspect, at its own expense,the operation of DER <br /> system as it relates to power quality, thermal limits and reliability. Failure by the <br /> Interconnection Customer to remain in compliance with the technical requirements will <br /> result in the DER system's disconnection from the Area EPS Operator's Distribution <br /> System. <br /> 8.7. Disconnection of DER <br /> The Area EPS Operator has the right to disconnect the DER in the event the <br /> Interconnection Customer: <br /> • Does not continue to follow and maintain IEEE 1547 settings approved by the Area <br /> EPS Operator as indicated by the adopted technical requirements. <br /> • Does not meet all the requirements of the Simplified Process. <br /> 10 <br /> 176 <br />
The URL can be used to link to this page
Your browser does not support the video tag.