My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.8. ERMUSR 05-14-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
05-14-2019
>
2.8. ERMUSR 05-14-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2019 12:09:04 PM
Creation date
5/10/2019 12:07:47 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/14/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3-DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br /> 1 Applicability <br /> 1.1. Capacity Limit <br /> The Simplified Process only is applicable to certified inverter-based Distributed Energy <br /> Resource (DER) systems with the capacity of 20 kW AC or less. The capacity is <br /> determined by the aggregated summation of the Nameplate Rating of the inverters <br /> that make up the DER system. Additional information regarding the capacity limits can <br /> be seen in Section 6 of the Process Overview document. <br /> 1.2. Certified Inverters <br /> A certified inverter will have certification of meeting the current version of the IEEE <br /> standard 1547. A common inverter certification is UL 1741. Note that certified inverters <br /> may still need to have a setting adjusted to meet the technical requirements of the <br /> Area EPS Operator. Additional information regarding certified equipment is found in <br /> Section 14 and Section 15 of the Process Overview document. <br /> 2 Application Submission <br /> 2.1. Simplified Process Application <br /> The Interconnection Customer shall complete the Simplified Interconnection <br /> Application and submit it to the Area EPS Operator to initialize the Interconnection <br /> Process. A completed Simplified Interconnection Application will include the following: <br /> • A completed Simplified Interconnection Application signed by the <br /> Interconnection Customer, <br /> • A non-refundable processing fee of$100, <br /> • An aerial site layout drawing of the proposed DER system, <br /> • A one-line diagram of the proposed DER system showing the point of common <br /> coupling, PCC, to the Area EPS Operator's Distribution System, and <br /> • All certified equipment manufacturer specification sheets. <br /> 2.2. Battery Storage <br /> An inverter-based DER system may include battery storage. DER systems that include <br /> battery storage must also complete the Energy Storage Application with the Simplified <br /> Interconnection Application. <br /> 1 <br /> 167 <br />
The URL can be used to link to this page
Your browser does not support the video tag.