My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7 PRSR 05-08-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Parks and Recreation Commission
>
P&R Packets
>
2011-2020
>
2019
>
05-08-2019
>
7 PRSR 05-08-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2019 2:23:34 PM
Creation date
5/3/2019 2:22:45 PM
Metadata
Fields
Template:
City Government
type
PRSR
date
5/8/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N:\Departments\Parks and Recreation\Commission\Packets\2019\05-08-2019 PRC Packet\7 Director's Report 5-8-19.docx <br />1. Do we plan to maintain the crossings (cross paths) on the GNT. The only “crossing” is from <br />the west side to the biathlon course. We can maintain this if needed during certain periods. All <br />of the staggered access points should be closed during the period of time in which the work will <br />happen on that section of trail. When agreements are finished and a contractor is in place we <br />will work to identify which of these points is most needed and try to keep them open when <br />possible. <br />2. Can the work be completed before mid-August? A cross country event is being planned for <br />mid-August. Not sure. No agreements are in place or approved yet. Our hope would be to <br />have the contractor start their work from the south and work north thereby opening segments <br />of the trail as they have completed their work. <br />3. Is the new parking lot on city property? Yes <br />4. How will the new parking lot be accessed and will it have curb and gutter? The parking lot is <br />served off of 221st as shown in the plan. At this time it is designed without curbing. If it is <br />desired by the city, we can ask the Developer to install it. It would be staff preference, in this <br />rural area, to not install it so the drainage is not directed to a single point or two but rather sheet <br />flow across the lot to ditch areas. This would be most consistent with the general feel of this <br />area. <br />5. Are all the lift stations underground? Yes. There are control panels and standby generation that <br />will be above ground in the fenced area by the new parking lot. <br />6. Will the work be done in a manner not to spread oak wilt? Our work should be outside of the <br />infection period. Also they are not planning any trimming as part of the work. <br />7. What will be the access to the trail from the new parking lot and its orientation? Asphalt as <br />shown in the plan. <br /> <br />Rivers Edge Commons Park Dock <br />City Council will discuss at a work session on May 6 the possibility of a dock at Rivers Edge <br />Commons Park. The newly proposed dock and location is more viable than past concepts <br />previously presented to Council. The new location would be on calmer waters location on city <br />property adjacent to Rivers Edge Commons directly behind McCoy’s Irish Pub. <br />Outdoor Ice Rink at Spectrum High School <br />An outdoor ice rink at Spectrum High School will be discussed at the May 6 City Council work <br />session. The cost to purchased, deliver and install dasher boards for an outdoor regular high school <br />ice rink is in the range of $60,000 to $105,000. An optional concrete pad for smoother ice is <br />estimated at $55,000. One possible funding source is park dedication as this would be a new <br />amenity. <br /> <br />Commission Work Session Wednesday, May 15 <br />A Commission work session is planned for Wednesday, May 15 to discuss the Rivers Edge <br />Commons Park Facility policy and athletic field fees. <br />
The URL can be used to link to this page
Your browser does not support the video tag.