My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. SR 05-06-2019
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2019
>
05-06-2019
>
8.1. SR 05-06-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2019 4:25:42 PM
Creation date
5/3/2019 9:54:09 AM
Metadata
Fields
Template:
City Government
type
CCM
date
5/6/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Multipurpose Facility and Lion John Weicht Park Estimate <br /> Qty of <br /> Construction Cost Estimate $25,639,132 Elk <br /> Includes: <br /> River <br /> • Senior Center $1,500,000 <br /> • Storm Piping to Lions Park $200,000 (Allowance) <br /> • Project Upgrades $310,151 <br /> • Contingency $1,500,000 <br /> Owner Costs $1,924,965 <br /> • SAC/WAC Fees <br /> • Security/Data/Audio/Scoreboards <br /> • Dasher boards/Flooring <br /> • Furniture/Concessions Equipment <br /> Total Proiect Estimate $27,564,097 <br /> Refrigeration System Expansion Add Alternates to Consider at Bid Time <br /> • Cost to expand refrigeration system to accommodate • Lease space (also temp team rooms) $454,180 <br /> future 3rd ice sheet: $505,657 • Commissioning $100,000 <br /> • Design team needs direction from City Council if this • Additional AC for Arena 1 $276,772 <br /> upgrade is to be included in the project • Infrared Heat $100,000 <br /> • Radiant In-Floor Heat $120,000 <br /> • Lighting of second softball field $135,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.