Laserfiche WebLink
<br /> <br />5. Since there is no easement provided for it, it is assumed that the public storm sewer <br />which currently drains the existing parking lot within the Jackson Place Addition will be <br />removed and not needed for development of a building in this area. <br /> <br />6. The final plat should be reviewed by MnDOT since it has frontage along Trunk <br />Highway 10 to determine if they have any concerns or comments. <br /> <br />7. Even the though the site is under one acre in size and will not require an NPDES <br />Construction Permit, erosion and sediment control is a major concern in the downtown <br />area. Any development on this site should be required to adopt the City's general Storm <br />Water Pollution Prevention Plan (SWPPP) and follow it prior, during, and after <br />construction. <br /> <br />If you have any questions regarding any of these comments, please call. <br /> <br />Sincerely, <br /> <br />r-,p;~ <br />T~urer.PE <br />City Engineer <br /> <br />S:\PLANNING\Case Files\2004\P 04-19 Jackson Block\04 1805 engr memo.doc <br />