Laserfiche WebLink
ElGREAT <br /> RIVER System Operations Outage Tracking - Daily Outage Report <br /> ENERGY.,. <br /> Wright-Hennepin Cooperative Electric Association <br /> Outage ID: 16837 Reason: 1F,clear,calm.At 2106,MOS EMSM4 was opened&Elk River 6NB6 was closed.At 2146,WH reported that <br /> Albertville sub inspected OK&opened SW EMS2.At 2147,MOS EMSM4 was closed but tripped out 1 sec later on <br /> time overcurrent(suspect high impedance due to conductor laying on snow).At 2148,MOS EMSM4 was opened <br /> &Elk River 6NB6 was closed.At 2151,Maple Lake 1NB1 was closed.At 2221,WH opened SW EMS1&closed SW <br /> EMS2.At 0046,broken bell found on EM str#114,conductor was laying on snow.Area was secured for repair on <br /> 3/1.RTN TBD. <br /> Breaker Distance Fault Type <br /> Elk River S6 6NB6-Maple Lake Line PRI 9.19 miles CG <br /> Elk River S6 6NB6-Maple Lake Line SEC 8.92 miles CG <br /> Maple Lake 1NB1-Elk River Line 16.04 miles CG <br /> Line Init.Cause Sus.Cause Start End Duration <br /> 600051 69 Elk River 6NB6-Maple Lake 1NB1(BL,EM, EMX) IF CF 02/28/2019 21:05 02/28/2019 22:21 1 hour 16 <br /> minutes <br /> Substation T/D Consumers Init.Cause Sus.Cause Start End Duration <br /> HXH003 Albertville T 1,840 IF CF 02/28/2019 21:05 02/28/2019 22:21 1 hour 16 <br /> minutes <br /> HXH014 Black Lake T 1,344 IF CF 02/28/2019 21:05 02/28/2019 21:51 46 minutes <br /> OUTG-018-Daily Outage Report - 1- 3/1/19 10:37:01 AM <br /> 187 <br />