Laserfiche WebLink
comply with the requirements for processing the application. Payment for costs will <br />be required whether the application is granted or denied. <br /> <br /> <br />10. Project Scoring <br />Projects scoring at a high desirability rating will be eligible to receive up to 100% of <br />the total incentive over two years. Projects scoring at a moderate desirability rating <br />will be eligible to receive up to 75 % of the total incentive over two years. Projects <br />scoring at a low desirability rating will be eligible to receive up to 50% of the total <br />Formatted: Left, Indent: Left: 0", First line: <br />incentive over two years. Projects scoring at not eligible, will not be eligible to <br />0" <br />receive this incentive. The amount of incentive determined is at the sole discretion of <br />the Economic Development Authority. <br />Comment \[OA11\]: The Project Scoring Criteria <br />was discussed with ERMU. Their billing system is <br /> <br />Formatted: Font: Gill Sans MT, Bold, Check <br />not capable of handling the tiered (100% , 75%, <br />50%) incentive levels. They will have to check with <br />spelling and grammar <br />their vendor to see if this is possible and what the <br />cost to the city would be to implement if they can do <br />it. <br /> <br />Formatted: Level 1, Line spacing: 1.5 lines, <br />Keep with next, Don't allow hanging <br />punctuation, Don't adjust space between Latin <br />and Asian text, Don't adjust space between <br />Asian text and numbers, Font Alignment: <br />Baseline <br />Formatted: Font: Garamond, Not Bold <br />Formatted: Font: Garamond, Check spelling <br />and grammar <br />Formatted: Left, Indent: Left: 0", First line: <br />0" <br /> <br /> <br /> <br />7 <br />