My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.1. EDSR 03-18-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA Packets
>
2014-2020
>
2019
>
03-18-2019 SPECIAL
>
2.1. EDSR 03-18-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2019 2:23:23 PM
Creation date
3/15/2019 2:15:00 PM
Metadata
Fields
Template:
City Government
type
EDSR
date
3/18/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />th <br />Comment \[OA14\]: At the Feb 19 meeting we <br />APPLICATION SCORING WORKSHEET <br />discussed a graduated scoring formula. <br /> <br /> <br />After discussions with our attorney to simplify the <br /> <br />TO BE COMPLETED BY CITY STAFF <br />process, we concluded that the application scoring <br /> <br />worksheet can be eliminated if the criteria is defined <br />within the policy and the application. <br />1. The project meets the criteria set forth in the Energy Incentive policy. <br /> a) Meets the objectives of the program <br /> c) Consistent with all city plans and ordinances. <br /> d) Meets the wage requirements as defined in the city’s business subsidy policy. <br /> <br /> <br />2. Job Creation in the City of Elk River: Points: _____ <br /> Number of new jobs as a result of the project. 50+ 5 <br /> Total Less than 50 0 <br /> <br /> <br />3. Wage Level of jobs created/retained or relocated Points: _____ <br />Minimum hourly wage Over $21/ hour 5 <br />of jobs created/retained: $19-20 / hour 4 <br /> $18 / hour 3 <br /> <br />4. Project size: Points: _____ <br />The project will result in the construction 50,000+ 5 <br />of square feet 40,000+ 4 <br /> 30,000+ 3 <br /> <br />5. Tax Base Generation: Points: _____ <br />The project will result in the annual estimated <br />Tax Base Generation $100,000+ 5 <br />of $90,000+ 4 <br /> $80,000+ 3 <br /> <br /> <br /> <br /> <br /> <br />Sub - Total Points: _____________of a possible 20 points. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.