My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.5. SR 03-18-2019
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2019
>
03-18-2019
>
4.5. SR 03-18-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2019 8:59:17 AM
Creation date
3/15/2019 8:58:21 AM
Metadata
Fields
Template:
City Government
type
SR
date
3/18/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit B <br /> Maintenance Standards <br /> Maintenance <br /> • Maintenance Equipment <br /> o Operator may use the current equipment allocated at Pinewood by the City to up keep <br /> the course to the standard listed below. Any additional equipment that is needed in the <br /> joint determination of the City and Operator shall be provided by City <br /> • Greens <br /> o Mowed daily to keep constant speed and conditions. <br /> o Topdressing and fertilizing will be scheduled by Jon Varty, depending upon the turf <br /> condition starting the year coming out of the winter. <br /> o Topdressing <br /> • Aerification will take place in the late fall and be top dressed in the spring—Fairways, Rough, <br /> Edging, and Tees <br /> o Mowed 3 to 4 times a week. <br /> o Fertilizing will be scheduled based on weather and turf conditions. <br /> o Use of IPM (ingrate pest management). Pesticide and fertilizer may only be used by a <br /> certified pesticide licensed company when needed, not a static plan. <br /> • Weed control of all the grounds. <br /> • Irrigation will be maintained with same parts as presently used, and blown out each fall during <br /> late October. <br /> • Equipment repairs and-maintenance will be performed by Operator. <br /> • The parties understand that there may be additional capital improvements required to make the <br /> facility fit for public use. Any capital improvements required will be paid by the City. <br /> Operator can assist in bidding it out to make sure to keep cost down. <br /> Clubhouse <br /> • Clubhouse must be maintained in proper condition in accordance with the state health and <br /> safety guidelines. <br /> • Each day the closing worker will have a checklist to complete and make sure that the clubhouse <br /> area is set for the next day. <br /> o Wipe down all tables. <br /> o Empty all garbage receptacles. <br /> o Turn off coffee warmer and coffee machine. <br /> o Clean coffee machine and coffee pots. <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.