My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.4. ERMUSR 03-12-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
03-12-2019
>
5.4. ERMUSR 03-12-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2019 3:20:29 PM
Creation date
3/8/2019 3:19:46 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
3/12/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Staff reviews these statistics in detail to find ways to continually improve our system. These <br /> statistics are very good compared to other utilities. As indicated by the following pie chart and <br /> statistics list, you can see the cause of the outages that we experienced in 2018. <br /> Outage Cause Count View <br /> Squirrel 17 <br /> Equipment Worn Out 6 ta! <br /> 18% Vehicle Acciden 5 <br /> Tree 5 <br /> squirrel Electrical Failure 4 <br /> 33% <br /> Unknown Contractor-Dig-In 3 <br /> 4% <br /> Unknown 2 <br /> Contractor-Dig-I Unknown/Other <br /> Contact with Foreign Object 2 4J <br /> VJiitllife 1 <br /> Electrical Failure <br /> 8% Lightning 1 C� <br /> [Equipment 1 c� <br /> [Heat 1 ,i- _ <br /> Wam out <br /> Tree 1 <br /> 10% <br /> [Eire 1 fl <br /> Vehicle Accident <br /> 10% Total 51 <br /> Many investor owned and cooperative run utilities "storm normalize "their reliability numbers <br /> by removing "major outages" due to storms from their reliability index number calculations. <br /> Our reliability numbers have not been storm normalized. Our numbers reflect these major <br /> outages and represent what our customer actually experienced in 2018. Overall, our electric <br /> distribution system is robust and our reliability is very high. <br /> ATTACHMENT: <br /> • APPA eReliability Tracker 2018 Annual Benchmarking Report for ERMU <br /> Page 3 of 3 <br /> 80 <br />
The URL can be used to link to this page
Your browser does not support the video tag.