Laserfiche WebLink
14 <br />side (~500 cy = $8,000)primary access (~30,000)dependent on design, materials and <br />overall programmingelevator (~$90,000)trails depending on elevation of <br />Earthwork Quantities$15,000) <br />•••••Fill was potentially needed for east TwoWest location may need additional Potential cost range of $600,000+ Export for west side (~1000 cy = -story building would require an <br />Nature Center <br />Budget Considerations <br />