My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. SR 03-04-2019
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2019
>
03-04-2019
>
8.1. SR 03-04-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2021 12:00:39 PM
Creation date
3/1/2019 8:27:21 AM
Metadata
Fields
Template:
City Government
type
CCM
date
3/4/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
accessible route from the parking lot to the building. This building would be designed and constructed in <br />the future with grant funds available through the GRMPTC. <br />Because of the additional work making changes to location and design, we will not meet the original <br />timeline in project scope of an early April bidding period. The extended timeline will not affect the work <br />tasks and related consultant fees. We still hope for a competive bidding environment later this year. <br />Financial Impact <br />Relocation of the nature playground to the west side of the parking lot will require additional site grading <br />and earthwork estimated to cost between $12,000 to $15,000. The additional work required to make <br />changes to the design is between $2,000 to $4,000, depending on the number of changes and meetings <br />required. This is in addition to the total fee of $43,000 for WSB, which comes from the Park <br />Improvement Fund. <br />The nature center relocation to the west side will require an accessible trail from the parking lot and, if <br />the nature center is built higher than the existing trail elevation on the north side of the parking lot, <br />additional trails will be required to access the higher elevation estimated at $28,000. This location change <br />will also require moving the parking lot lights estimated at $10,000. <br />The preliminary estimated cost for a future nature center is $600,000. If the nature center were to include <br />more than one level as discussed by the committee, an interior elevator would be necessary, estimated at <br />an additional $90,000. <br />Attachments <br />■ WTRP Master Plan Site Location and Proposed Site Location <br />■ WTRP Playground Concept Plan Master Plan Location <br />■ WTRP Playground Concept Plan Master Plan Proposed Location <br />■ Park Improvement Fund Spreadsheet <br />N:APublic Bodies\Agenda Packets\03-04-2019\Final\x8.1 sr Woodland Trails Master Plan change.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.