My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-26-2002 PC MIN
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Minutes
>
2000 - 2009
>
2002
>
02-26-2002 PC MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:35:12 AM
Creation date
5/23/2005 8:42:50 AM
Metadata
Fields
Template:
City Government
type
PCM
date
2/26/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Planning Commission Minutes <br />February 26, 2002 <br />Page 2 <br /> <br />e <br /> <br />Commissioner Franz asked City Engineer Terry Maurer, if the chemical used in hair <br />processing would impact the private septic system. Mr. Maurer stated that the strength and <br />volume of the waste for this use is limited and should not be a problem. <br /> <br />Commissioner Schuster arrived at this time (6:36 p.m.) <br /> <br />COMMISSIONER FRANZ MOVED TO RECOMMEND APPROVAL OF THE <br />REQUEST BY TAMMY WEEKS FOR A CONDITIONAL USE PERMIT FOR A <br />HOME OCCUPATION, CASE NO. CU 02-03, WITH THE FOLLOWING <br />CONDITIONS: <br /> <br />1. THE SALON SHALL COMPLY WITH THE BUILDING CODE <br />REQUIREMENTS. <br />2. THE APPLICANT SHALL MEET ALL STATE LICENSING <br />REQUIREMENTS. <br />3. IF ADDITIONAL WORKSTATIONS AND/OR TANNING BEDS ARE <br />TO BE PROVIDED, THE APPLICANT SHALL APPLY FOR AN <br />AMENDMENT TO THE CONDITIONAL USE PERMIT. <br /> <br />COMMISSIONER ROPP SECONDED THE MOTION. THE MOTION <br />CARRIED 4-0. <br /> <br />5.2. <br /> <br />Request by JKCD, Ltd. for Conditional Use Permit (Sterling Community Bank), Public <br />Hearing - Case No. CU 02-04 <br /> <br />e <br /> <br />Staff report by Chris Leeseberg. ]KCD, Ltd. requests a conditional use permit to allow the <br />construction of a 4,235 square foot banking facility, Sterling Community Bank on Lot 2, <br />Block 1, Elk River Crossing 2nd Addition. Mr. Leeseberg reviewed the layout of the facility, <br />construction materials, location of the drive-thru teller lanes, landscaping, and parking and <br />circulation. Staff recommends approval of the request with the three conditions listed in the <br />supplemental staff report. <br /> <br />Commissioner Baker arrived at this time (6:38 p.m.) <br /> <br />Chair Pederson opened the public hearing. <br /> <br />Kathy Anderson, principal for KKE Architects, stated that they have no problem with <br />the conditions noted by staff. <br /> <br />Commissioner Mesich asked if staff felt there may be a problem with stacking of vehicles in <br />the drive-thru lanes. Mr. Leeseberg stated that there is adequate room. <br /> <br />Chair Pederson asked for clarification on placement of the handicap stalls. Mr. Leeseberg <br />explained the location of the stalls. <br /> <br />e <br /> <br />Commissioner Franz asked if the sign issue has been resolved. Ms. Anderson pointed out <br />the proposed location of the monument sign. Mr. Harlicker stated that the applicant will <br />need to work with the power company on locating the sign, since this area contains an <br />easement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.