My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.5. PCSR 02-26-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2019
>
02-26-2019
>
4.5. PCSR 02-26-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2019 2:54:15 PM
Creation date
2/20/2019 2:52:06 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
2/26/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10.The proposed 18” FES needs to discharge within the basin sidewall, not short of the basin <br />within the hillside, also, include energy dissipation according to city standards. <br />The preliminary plans have been revised to show the proposed 18” FES discharging within the basin <br />sidewall and energy dissipation via a 4.2’ invert drop in the upstream manhole (CB #7). <br />Ok <br /> <br />11.Will the existing 18” FES and stormwater system stay on-line or be abandoned? If so, Hydro <br />CAD needs to be included for this and the basin needs to be cleaned out to original design or <br />enlarged based onrequirements. <br />The existing 18” FES and stormwater system will be removed and this is shown on the existing conditions <br />plan. As stated previously, the existing stormwater basin will be expanded based on the current City <br />requirements. <br />Staff will review these documents once they have been submitted. <br /> <br />12.The proposed stormwater lines show it tying together at CB #8, provide detail of how this <br />will work. <br />CB #8 is proposed to be built over the existing storm sewer pipe because there is insufficient depth within <br />the existing system to accommodate the proposed improvements. A detail of CB #8 will be included in <br />the construction documents. <br />Staff will review these documents once they have been submitted. <br /> <br />13.Provide pipe sizing chart report. <br />Storm sewer sizing calculations will be completed during the construction documents phase. <br />Staff will review these documents once they have been submitted. <br /> <br />14.Show parking lot contours, direction of flow and grade percentages. Also, show pipe slope <br />percentages. <br />As stated previously, final contours, grades and flow arrows will be included in the construction documents. <br />Pipe slopes are shown on the preliminary plans. <br />Staff will review these documents once they have been submitted. <br /> <br />15.Indicate where all roof drainage is being directed to, and not which CB#. <br />Existing and proposed roof drainage will be directed to locations of the Dura-Slope trench connections. <br />More detailed information will be included in the construction documents for each project. <br />Staff will review these documents once they have been submitted. <br /> <br />16.The city was not able to review the proposed stormwater system for the ‘proposed 4-story <br />apartment building’ because it is cut off on page C-2, update accordingly. <br />The proposed storm sewer system for the Riverwalk Apartments project is included in the revised preliminary <br />plans. <br />The plans do not match calculated hardcover existing/proposed numbers. The discrepancies <br />need further explanation. <br /> <br />17.Submit long term maintenance plan for all BMPS. <br />Long term maintenance plans for all proposed stormwater BMPs will be completed during the construction <br />documents phase. <br />Staff will review these documents once they have been submitted. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.