My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-24-1999 PC MIN
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Minutes
>
1990 - 1999
>
1999
>
08-24-1999 PC MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:35:10 AM
Creation date
5/20/2005 2:31:00 PM
Metadata
Fields
Template:
City Government
type
PCM
date
8/24/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Planning Commission Minutes <br />August 24, 1999 <br />Page 6 <br /> <br />. <br /> <br />Peter Knaeble of Terra Engineering, representing Bridgeland Development Co., <br />stated that a neighborhood meeting was held on August 12, 1999. He reviewed <br />issues associated with the plat regarding density, tree removal, wetlands and <br />storm water. Mr. Knaeble felt the density of the proposed plat was consistent with <br />the surrounding developments. <br /> <br />Steve Nelson, representing Bridgeland Development Co., stated that the 27 acre <br />conservation easement which will be dedicated to the homeowners' association <br />will be a permanent easement. He stated that if the homeowners' association is <br />properly established, there should not be a problem if a septic failure occurs and <br />that individual homeowners will still be responsible for the cost. Mr. Nelson stated <br />that the value of the homes in this development is expected to be $250,000 and <br />up. <br /> <br />Curt Kragness, 10718 201 sf Circle, expressed his concern that the stand of pine <br />trees in the northwest corner of the site will remain. Mr. Kragness asked what the <br />difference was between R 1 a and PUD zoning. Mr. Harlicker explained that the <br />PUD allows flexibility in setbacks, lot sizes and preservation of certain amenities. <br />He noted that this property is a difficult site to develop and that a number of <br />plans have been presented to the city for this site and all were similar to this plan. <br />Mr. Kragness asked if 201 sl Circle will become a through-street. Mr. Harlicker <br />stated that 201 sl would not be a logical connection and any future connection <br />would likely be to the north at 203rd A venue. <br /> <br />. <br /> <br />Commissioner Mesich stated that he felt in this case, the PUD zoning was being <br />used for creative profit not creative development. He explained that the PUD <br />ordinance specifies that a proposal shall be consistent with the Comprehensive <br />Plan and allows flexibility without changing the underlying zoning. He stated that <br />he felt Bridgeland's proposal does not meet the criteria for a PUD. <br /> <br />Doug Kraus, 20050 Tyler Street, explained that the new road from this <br />development will face his front yard. He was concerned about traffic speed on <br />Tyler and felt visibility at the proposed intersection will pose a safety concern. Mr. <br />Nelson stated that he will work with Mr. Kraus to screen his property from <br />headlights, but that he could not mandate what is done about vehicle speed <br />and traffic volume on Tyler Street. <br /> <br />Commissioner Chambers asked if sidewalks and street lights would be installed. <br />Mr. Nelson explained their proposal and noted that no sidewalk will be provided, <br />but lights are required and trails will be installed in the open space. <br /> <br />Commissioner Kuester asked why clustered septic systems were not proposed. <br />Mr. Nelson stated that the process for approval of clustered systems was too long <br />and did not fit into their plan. Commissioner Kuester stated that she felt there <br />would be more protection for the homeowners on a clustered system if a <br />problem arose. <br /> <br />. <br /> <br />Mr. Rich Hawkins, attorney representing the developers, indicated that the <br />homeowners' association documentation is fairly simple and will be structured to <br />address septic system problems or failures. He noted that even though the septic <br />systems will be the responsibility of the homeowners' association, the individual <br />property owner will still have the responsibility to maintain their own system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.