Laserfiche WebLink
Fees Schedule ERMU 2007 <br />Elk River Municipal Utilities Proposed 2008 Rate & Fees Schedule <br />A <br />=13 <br />C <br />D E <br />_ _ <br />Current <br />Proposed <br />Residential Electric Connection Developer <br />$ <br />420.00__ <br />$ <br />420.00 <br />(Per Unit If City Water & Sewer) <br />idential Electric Connection Develo er <br />$ <br />520.00 <br />$ <br />520.00 <br />(Per Unit If not Cit Water & Sewer) <br />Residential Electric Connection Builder <br />$ <br />800.00 <br />$ <br />800.00 <br />Per Unit <br />Commercial & Industrial Electric Connection <br />50% <br />50% <br />(50% of Utilities cost) -Deposit to be aid up front <br />Street Edits & Security Lights <br />Our Cost <br />Wood Pole w/6' Arm (existing area only) <br />950.00 <br />$ 865.54 <br />30' Decorative Pole w/6' Arm <br />_$ <br />$ <br />__966_6_o_-$ _. <br />1,650.00 <br />$ <br />1,800.00 <br />_ <br />$1,714.90 <br />23' Decorative Pole wrrraditionaire Lamp <br />$ <br />1,400.00 <br />$ <br />1,450.00 <br />$1,340.30 <br />Residential Water Connection <br />$ <br />2,000.00 <br />$ <br />2,000.00 <br />per unit (300 pd b developer, 1700 paid by final customer) <br />Commercial Water Connection <br />$ <br />2,000.00 <br />$ <br />2,000.00 <br />per WAC unit <br />ervice Repair <br />$ <br />2,500.00 <br />$ <br />2,500.00 <br />eters - (Commercial 1 per bid <br />Our Cost for 2007 <br />- Residential <br />$ <br />240.00 <br />$ <br />240.00 <br />$ 221.29 <br />M7A <br />$ <br />270.00 <br />$ <br />270.00 <br />$ 258.76 <br />$ <br />320.00 <br />$ <br />320.00 <br />$ 308.04 <br />isc <br />$ <br />570.00 <br />$ <br />570.00$ <br />543.33 <br />urbo - Irri ation onl <br />$ <br />860.00 <br />$ <br />860.00 <br />$ 837.87 <br />$ <br />740.00 <br />$ <br />740.00 <br />$ 716.82 <br />2" Turbo <br />$ <br />940.00 <br />$ <br />940.00 <br />$ 877.32 <br />3" Turbo <br />$ <br />1,050.00 <br />$ <br />1,050.00 <br />$ 992.83 <br />2" Compound <br />$ <br />1,900.00 <br />$ <br />1,900.00 <br />$1,817.33 <br />3"Compound <br />$ <br />2,250.00 <br />$ <br />2,250.00 <br />$2,146.50 <br />NSF Fee <br />$ <br />20.00 <br />$ <br />20.00 <br />Disconnect Fee - Residential Daytime <br />$ <br />50.00 <br />$ <br />50.00 Daytime <br />Fvp.ninn <br />$ <br />100.00 <br />$ <br />100.00 Evenin <br />u .connect Fee - 3 Phase Daytime <br />$ <br />150.00 <br />$ <br />150.00 Daytime <br />Evening <br />$ <br />350.00 <br />$ <br />350.00 -venin <br />Red Tag Handling Fee <br />$ <br />20.00 <br />$ <br />20.00 <br />Electric -Residential <br />Basic Monthly Charge <br />$ <br />7.50 <br />$ <br />7.50 per month Electric Rate Increase 7.2% <br />May - Sept usage <br />$ <br />0.09397 $ <br />0.10000 per KWh <br />Oct - April usage <br />$ <br />0.07877 $ <br />0.08480 <br />er KWh <br />Offpeak Energy Storage <br />$ <br />0.041 $ <br />0.0420 KWh per month <br />Offpeak Dual Fuel <br />$ <br />0.043 $ <br />0.0440 KWh per month <br />Cycled AC <br />$ <br />6.00 $ <br />8.00 $8/month for 5 summer months <br />Wind Power <br />$ <br />1.90 $ <br />1.90 100 <br />KW Blocks <br />Dispurse Generation <br />See Attached <br />Electric - Commercial/Industrial <br />Non -Demand Basic Monthly <br />$ <br />16.00 $ <br />16.00 per <br />month <br />Non -Demand May - Sept usage <br />$ <br />0.09062 $ <br />0.09732 per KWh <br />Non -Demand Oct - April usage <br />$ <br />0.06872 $ <br />0.07542 er KWh <br />Demand Basic Monthly <br />$ <br />50.00 $ <br />50.00 per month <br />Demand Energy Char e <br />$ <br />0.0422 $ <br />0.04542 per KWh <br />Demand May - Sept usage <br />$ <br />13.78 1 $ <br />14.98 er KW <br />Demand Oct - April usage <br />$ <br />9.78 $ <br />10.60 1 per KW <br />Fees Schedule ERMU 2007 <br />