My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.1.B. ERMU MINUTES 01-11-2011
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2011
>
01-11-2011
>
3.1.B. ERMU MINUTES 01-11-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2019 12:34:53 PM
Creation date
2/1/2019 12:34:06 PM
Metadata
Fields
Template:
City Government
type
ERMUMIN
date
1/11/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 <br />Regular meeting of the Elk River Municipal Utilities Commission <br />December 14, 2010 <br />5.2 Review and Consider Hiring of Replacement Water Operator <br />At the November 17, 2009 ERMU Commission meeting, the Commission was informed of the <br />resignation of one of the water operators. At that time the recommendation to the Commission was to <br />hold -off on replacing the water operator. Due to the work load and maintenance issues, staff now <br />recommends hiring a replacement water operator. <br />Jerry Gumphrey moved to approve the hiring of a replacement water operator. Daryl <br />Thompson seconded the motion. Motion carried 3-0. <br />5.3 Review and Consider Gary Street Water Tower Engineering Bids <br />Bids were recently received for engineering services for the painting of the Gary Street Water <br />Tower. Staff recommends awarding the bid to Bolton & Menk, Inc., the lowest responsive bidder. <br />Jerry Gumphrey moved to award the bid to Bolton & Menk, Inc, the lowest responsive bidder. <br />Daryl Thompson seconded the motion. Motion carried 3-0. <br />5.4 Review and Consider 2011 Budget, Rates, and Fees <br />The blended wholesale power cost increase to ERMU is approximately 2%. The proposed 2011 <br />rates for residential and non -demand commercial customers is 2.1%, with an increase of 1.8% for <br />demand commercial customers. Another item for discussion was the 10% late fee being charged to <br />customers that do not pay their bill on time. Discussion followed. Consensus of the Commission was <br />to keep this policy as it is a good incentive for customers to pay their bill on time. <br />As determined by the recent water rate analysis, water rates are proposed to remain unchanged <br />for 2011. The water access charge is budgeted to increase from $2500 to $3000. This increase was <br />already approved by the Commission and adopted into City ordinance with the City's fee schedule. <br />Jerry Gumphrey moved to approve the 2011 budget as presented. Daryl Thompson seconded <br />the motion. Motion carried 3-0. <br />5.5 Review and Consider Write -Offs <br />Write-offs for miscellaneous invoices from Miscellaneous Accounts Receivable totaling <br />$10,773.34 were reviewed. Discussion followed. <br />Jerry Gumphrey moved to accept the write-off listing for the miscellaneous invoices as <br />presented. Daryl Thompson seconded the motion. Motion carried 3-0. <br />
The URL can be used to link to this page
Your browser does not support the video tag.