Laserfiche WebLink
Alternative Generation <br />Landfill Gas Generator <br />26.2 Million kWh in 08 <br />12% Of ER Needs <br />Performance Factor = 99% <br />Capacity Factor = 94% <br />Wind Generator <br />829 Thousand kWh in 08 <br />.37% Of ER Needs <br />Capacity Factor = 14% <br />ERMU Diesel Plant <br />10 MW On Standby <br />Ran 50 Hours In 2008 <br />Power Supply Update <br />Present Contract Expires <br />Oct 2018 <br />Discussions With: <br />Connexus Energy <br />CMMPA and Big Stone II <br />WHEC and Basin Power <br />MMPA and <br />Future Discussion With: <br />Minnesota Power <br />Xcel Energy <br />SMMPA <br />and Others <br />