My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. ERMUSR 03-10-2009
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2009
>
03-10-2009
>
5.1. ERMUSR 03-10-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 11:02:00 AM
Creation date
1/31/2019 11:01:36 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
3/10/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ZehrP nger, Vance <br />-rom: Shawn Mulhern [smulhern@klmengineering.comj <br />Sent: Thursday, March 05, 2009 12:46 PM <br />To: Zehringer, Vance <br />Cc: Laurie Sylte <br />Subject: Proposal for Jackson Street Water Tower Inspection <br />Attachments: Elk River, MN MU 100,000 Rivited Tower.doc <br />Vance, <br />Please review the attached proposal. <br />As discussed the rough estimate for a demolition would be in the range of $25,000450,000. <br />A discussion with my partner Jack Kollmer regarding the disposal of scrap metal with lead paint is still not regulated. In <br />the future we do expect to see this will change into a law. The cost of this would be very difficult for KLM to estimate. <br />Again the removal could be done at ground level with Blastox or Pre-tox. The owner will still be on the record for this <br />material from cradle to grave. If it does get scrapped out there is a transfer of ownership. <br />After KLM has evaluated the tower we will be able to give you a better idea as to the cost effectiveness of taking it down <br />or keeping it and repainting. <br />In our enclosures I have include the MPCA rule for lead paint removal. <br />Please call me with any questions. <br />Shawn A. Mulhern <br />Marketing Manager <br />KLM Engineering, Inc. <br />651-773-5111 Phone <br />651-773-5222 Fax <br />612-817-9899 Cell <br />smulhem@klmengineering.com <br />www.klmen ineerin com <br />DISCLAIMER: <br />The information in this message is confidential, may be legally privileged, and is intended for the sole use of the <br />addr'i Access to this message by another person is not permitted. If you are not the intended recipient, any <br />disclosure, copying, distribution or any action taken or committed in reliance on it is prohibited and may be <br />unlawful. If you have received this e-mail by mistake, please e-mail the sender by replying to this message, and <br />deleting the original and any printout thereof. <br />
The URL can be used to link to this page
Your browser does not support the video tag.