Laserfiche WebLink
Major Water Projects <br />.200s _. <br />New Main @ Hwy 10 <br />Replaced 4th Street Main <br />New Main Loop on Carson <br />Added Well 9 To System <br />•2009 <br />New Raw Main - Well 7 To 9 <br />New Main On 1931d Ave <br />New Main On Cry Rd 13 <br />Complete Main On Cty Rd 40 <br />Meter Conversion to Radio Read <br />Competitive Rates <br />-.Residential (1000 kWh/mo) <br />ERMU = $1,312 <br />Connexus Energy = $1,366 <br />WHCEA = $1,311 <br />Xcel = $1,262 <br />-Commercial (5,000 kWh/mo) <br />ERMU = $5,792 <br />Connexus Energy = $6,470 <br />WHCEA = $6,159 <br />Xcel = $5,892 <br />•Industrial (90,000 kWh/mo) <br />ERMU = $102,045 <br />Connexus Energy = $93,540 <br />EI <br />River <br />EI <br />Rear <br />