My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. DRAFT HRA MINUTES (2 SETS) 02-04-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Housing & Redevelopment Authority
>
HRA Packets
>
2010-2019
>
2019
>
02-04-2019
>
5.1. DRAFT HRA MINUTES (2 SETS) 02-04-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 3:30:49 PM
Creation date
1/31/2019 8:22:03 AM
Metadata
Fields
Template:
City Government
type
HRSR
date
2/4/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Housing and Redevelopment Minutes Page 2 <br />January 7, 2019 <br />----------------------------- <br /> <br />5. Open Forum <br /> <br />No one appeared for Open Forum. <br /> <br />6. Public Hearings <br /> <br />There were no public hearings. <br /> <br />7.1 HRA Housing Rehabilitation Loan Program <br /> <br /> Ms. Othoudt presented the staff report. She introduced Jim Hasnik, Director of Lending <br />Services from the Center for Energy and Environment (CEE), who presented the <br />rehabilitation loan program details to the HRA with a PowerPoint presentation about their <br />loan program offerings, some offerings which are already available to Elk River residents. He <br />indicated the loan documents included in the packet were drafts that could be crafted to the <br />HRA’s policy and vision for this rehabilitation program. <br /> <br />Chair Toth asked if CEE has their own programs they fund or do they only administer to <br />cities. <br />Mr. Hasnik stated a little over half of their loans are using their own funding for energy and <br />home improvement programs as well as solar and commercial programs. The remaining loan <br />programs are funded by city dollars and each city has unique programs based upon their <br />criteria. He explained the handouts and updates to the loan format sheets, noting Elk River’s <br />would be crafted for our needs. <br /> <br /> Chair Toth asked what the cost savings would be for switching from CMHP to CEE. <br /> <br />Ms. Othoudt stated they reviewed the cost savings at the December meeting and the HRA <br />agreed it would benefit the HRA to proceed with CEE due to the significant cost savings <br />and administration of the loan program. <br /> <br />Chair Toth asked how long it would take to implement the CEE loan program. <br /> <br />Mr. Hasnik indicated it would take approximately one month to implement the program <br />which included writing the contract and setting up the computer programs and loan <br />documents. <br /> <br />Chair Toth asked if there were any pending loans awaiting approval by CMHP. <br /> <br />Ms. Othoudt stated there was one loan that the HRA would be reviewing for approval that <br />evening. She stated that loan would be approved through CMHP. She said there were no <br />other pending loans and any new loans would be run through CEE after approval of the <br />paperwork. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.