Laserfiche WebLink
Memorandum <br /> <br /> <br /> <br /> <br /> <br />To: Planning Department <br /> <br />From: Brandon Wisner, Stormwater Coordinator <br /> <br />Date: January 10, 2019 <br /> <br />Subject: Site Plan Review January 2019 <br />_______________________________________________________________________ <br /> <br />The department listed above has reviewed the application listed below and has the following <br />comments: <br /> <br />rd <br />Case# CU 18-21 Abiding Savior Lutheran Church, 12942 - 193 Ave NW - <br />Church and Parking Lot Addition <br /> <br /> <br />1. Stormwater management requirements must be met as listed in Ordinance Sec. <br />78-503. - Stormwater and urban runoff control. and Sec. 78-504. - Post <br />construction stormwater management for proposed new or redeveloped <br />impervious surfaces. http://mn-\\ <br />elkriver.civicplus.com/DocumentCenter/View/3180 <br /> <br />2. Provide HydroCAD, MIDS report and a stormwater management report that <br />explains the project and how the project will meet rate, volume and water quality <br />requirements listed in the city stormwater ordinance. <br /> <br />3. A long term operations and maintenance plan will need to be submitted to the <br />city for any permanent stormwater BMP. <br /> <br />4. An issued NPDES permit is required prior to construction starting. <br /> <br />5. How does the addition to the parking lot reach the proposed south stormwater <br />basin? City ordinance requires curb to be installed for the perimeter of a parking <br />lot. <br /> <br /> <br /> <br /> <br />