My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HR SPECIAL MEETING AGENDA 01-14-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Housing & Redevelopment Authority
>
HRA Packets
>
2010-2019
>
2019
>
01-14-2019 SPECIAL
>
HR SPECIAL MEETING AGENDA 01-14-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 4:24:50 PM
Creation date
1/11/2019 9:23:25 AM
Metadata
Fields
Template:
City Government
type
HRSR
date
1/14/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Exhibit A Page 4 <br />Agreement between Elk River HRA and Center for Energy and Environment <br /> <br />Post Installation Inspection: : Permits must be obtained and signed off by a City inspector where <br />required; when not required, a post installation inspection will be performed by a City of Elk River <br />representative to ensure the work has been completed before any funds will be released. <br /> <br />Loan Security: All loans will be secured with a mortgage in favor of the Elk River Housing and <br />Redevelopment Authority. Borrower will pay all applicable title and filing fees, which may be financed in <br />the loan amount. <br /> <br />Borrower Fees: Borrower will be responsible for a 1% origination Fee, $50 Document Preparation Fee, <br />mortgage filing and service fees, flood certificate, credit report fees and any other applicable closing <br />costs, all which may be financed in the loan amount. <br /> <br />Underwriting Decision: Applicants must have acceptable credit history (see CreditRequirements). CEE <br />will approve or deny loans based on a credit report, income verification and other criteria as deemed <br />necessary through CEE’s underwriting guidelines. CEE shall refer to the Elk River HRA for any <br />questionable situations. <br /> <br />Work Completion: All work must be completed within 120 days of the loan closing. However, when <br />warranted, CEE may authorize exceptions on a case by case basis. <br /> <br />General Program Conditions <br /> <br />Application Processing: Loans will be distributed on a first come first serve basis as borrowers qualify. <br />Applicants must provide a completed application package including, but not limited to: <br /> Completed and signed application form <br /> Proof of income <br /> Bids or estimates for proposed projects <br /> Valid Identification <br /> Other miscellaneous documents CEE may require. <br /> <br />Program Costs: Loan origination, remodeling advisor visit fees and other administrative fees will be paid <br />out of the Program Budget. Loan program marketing efforts will be billed directly to the City of Elk River <br />Housing and Redevelopment Authority. Should the HRA choose to commission CEE for marketing <br />support it will be a separate expense.. <br /> <br />Total Project Cost: It is the borrower’s responsibility to obtain the amount of funds necessary to finance <br />the entire cost of the work. In the event the final cost exceeds the original loan amount, the borrower <br />must obtain the additional funds and show verification of the additional funds in order to be approved <br />for the loan. <br /> <br />Disbursement Process: Payment to the contractor (or owner in sweat equity situations) will be made <br />upon completion of work. An inspection will be performed by a city inspector and/or representative to <br />verify the completion of the work. The following items must be received prior to final disbursement of <br />funds: <br />• Final invoice or proposal from contractor (or materials list from supplier); <br />• Final inspection verification by a City Inspector or representative;
The URL can be used to link to this page
Your browser does not support the video tag.