My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.3. ERMUSR 01-08-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
01-08-2019
>
2.3. ERMUSR 01-08-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2019 3:57:21 PM
Creation date
1/4/2019 3:57:10 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
1/8/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Large Industrial Demand Electric Service Rate <br /> Determination of Billing Demand:The billing demand shall be the highest measured demand (corrected <br /> for power factor if required) during any fifteen (15) minute period occurring in the current billing period. <br /> Fluctuating Loads: Customers operating equipment having a highly fluctuating or large instantaneous <br /> demand, such as welders and X-ray machines,shall be required to pay all non-betterment costs of <br /> isolating the load from the balance of ERMU's system so that the load will not unduly interfere with <br /> service on ERMU's lines. No motor larger than ten (10) HP (or 7.355 kW)will be allowed to be across- <br /> the-line started without notification and written authorization from ERMU. <br /> Power Factor Adjustment: Power factor adjustments may be made in the billing demand,when the <br /> power factor,as determined by test, at the time of the Customer's maximum use is less than 95%. If the <br /> power factor,as measured by ERMU's electric department, is lower than 95%,the monthly demand <br /> charge may be multiplied by the ratio 95%divided by the measured power factor,or at ERMU's option, <br /> the power factor may be corrected at the Customer's expense. <br /> Billing and Terms of Payment:See ERMU Service Policies Policy(Billing Due Dates, and Penalties and <br /> Delinquent Notices.) <br /> Terms and Conditions: <br /> 1. Usage may be fractionalized on the actual days of service for application of a change in rate. <br /> 2. Service will be furnished under ERMU Policies and rules. <br /> 3. Extensions made for service under this schedule are subject to the provisions of ERMU's Elk <br /> River Municipal Utilities' rules governing Extension of Service and Facilities. <br /> 4. The rates set forth herein may be modified by the amount of any governmental changes <br /> imposed and levied on transmission, distribution, production,or the sale of electrical power. <br /> 5. Exceptions by management approval only. <br /> Adopted January 8, 2019 <br /> Effective January 1, 2019 <br /> Page 2 of 2 <br /> 39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.