My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.0.B. SWCSR 12-19-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Sherburne Wright Cable Commission
>
SWC Packets
>
2018
>
12-19-2018
>
2.0.B. SWCSR 12-19-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2018 12:18:04 PM
Creation date
12/28/2018 12:18:03 PM
Metadata
Fields
Template:
City Government
type
SWCSR
date
12/19/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />EXHIBIT B <br /> <br />(Technical Standards- Live Origination Sites) <br /> <br />With respect to all sites listed in Exhibit A, the System shall meet or exceed the following <br />requirements: <br /> <br />1. The System shall operate in conformance with the technical standards <br />promulgated by the FCC pursuant to Title 47, Section 76.601 to 76.617, as may be <br />amended or modified from time to time. <br /> <br />2. The System shall be capable of continuous 24-hour operation without <br />signal degradation. <br /> <br />3. The System shall be capable of operation without failure, material <br />performance changes or signal degradation over an outdoor temperature range of -40 <br />degrees F to +130 degrees F and over a variation in supply voltages from 105 to 130 volts <br />AC. <br /> <br />4. The System will provide access channel connections up to the demarcation <br />point, both upstream and downstream, without material signal degradation or <br />deterioration and with signal quality equal to or better than any other channels. Material <br />signal degradation or deterioration where any signal problem including ghosting or other <br />audio or visual distortion or interference is apparent without special testing. The Grantee <br />shall not be responsible for technical problems deriving from facilities or equipment <br />located beyond the demarcation point, within the institutional site. <br /> <br /> <br /> <br />526220v5 RJV SH255-14 <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.