My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.1. SR 12-17-2018
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2018
>
12-17-2018
>
7.1. SR 12-17-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2018 1:36:08 PM
Creation date
12/14/2018 12:13:07 PM
Metadata
Fields
Template:
City Government
type
SR
date
12/17/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River = 2019 Utilities Fee Schedule <br /> Municipal Utilities <br /> New Residential Electric Connection - Developer- Lot with ERMU water service $475.00 <br /> New Residential Electric Connection - Developer- Lot without ERMU water service $575.00 <br /> New Residential Electric Connection - Builder $875.00 <br /> New Wire Footages over 200' (per foot) $4.00 <br /> New Service Frost Trenching(per foot) $5.00 <br /> New Commercial&Industrial Electric Connection 50% <br /> Service Upgrades or Additions for Existing Customers 100% <br /> Minimum Temporary Electric Service Fee- Existing Transformer $150.00 <br /> Minimum Temporary Electric Service Fee-Without Existing Transformer $500.00 <br /> Street Light- 30' Decorative Pole with 6'Arm and Fixture $1,850.00 <br /> Street Light- 23' Decorative Pole with Traditionaire Fixture $1,500.00 <br /> Security Light-Wood Pole with Fixture $975.00 <br /> Security Light- Existing Pole $125.00 <br /> Pole Attachment Fee (per pole) $6.50 <br /> Water Access Charge=Water Connection Charge+Water Availability Charge $3,764.00 <br /> Water Connection Charge(Per Plumbing Unit) - Builder $3,396.00 <br /> Water Availability Charge(Per Plumbing Unit) - Developer $368.00 <br /> Abandoned Water Service $2,500.00 <br /> Hydrant Water Sales - Rental (per week) $50.00 <br /> Hydrant Water Sales - Units (per 1000 gallons) $4.00 <br /> Deposit for 5/8"Hydrant Meter $150.00 <br /> Deposit for 2 1/2"Hydrant Meter $1,000.00 <br /> Private Hydrant Maintenance Program Monthly Fee $5.00 <br /> ADMINISTRATIVE <br /> Administrative Fee for Continued Submission of Checks After No-Check Notice Given $20.00 <br /> Billable Cost of Materials Markup 15% <br /> Billable Labor Markup 55% <br /> Billable Vehicle/Equipment(per employee per hour) $30.00 <br /> Commerical Application Fee $20.00 <br /> Electric Service Disconnect/Trip Fee- Meter Technician $50.00 <br /> Electric Service Disconnect/Trip Fee- Line Crew $150.00 <br /> Energy Audit $150.00 <br /> Meter Tampering Fee $250.00 <br /> Meter Testing Fee $50.00 <br /> NSF Fee $20.00 <br /> Penalty Amount 10% <br /> Photocopies (per page) $0.25 <br /> Red Tag Handling Fee $20.00 <br /> Water Shut-Off Fee $100.00 <br /> Adopted by the Utilities Commission on November 93, 2018 under authority per Minnesota Statute 492.369 <br />
The URL can be used to link to this page
Your browser does not support the video tag.