Laserfiche WebLink
City oMemorandum <br /> Ellk - <br /> RiV6' r <br /> To: Planning Department <br /> From: Brandon Wisner, Stormwater Coordinator <br /> Date: November 6, 2018 <br /> Subject: Site Plan Review—November 2018 <br /> The department listed above has reviewed the application listed below and has the following <br /> comments: <br /> Case #V 18-09 Gerald R. Sizer —Variance <br /> 1. No concerns or issues with the application as proposed. <br /> Case #CU 18-18 John Anderson—Conditional Use Permit <br /> 1. Show all proposed grades and where a driveway to the proposed building is located, <br /> if one is to be installed. Ensure that drainage is not directed onto neighboring <br /> properties. <br /> Case #V 18-10 Jared Bradford/ Union Church-Variance <br /> 1. No concerns or issues with the application as proposed. <br /> Case #CU 18-19 ResCareMN—Conditional Use Permit <br /> 1. No concerns or issues with the application as proposed. <br /> Case #IU 18-01 D.R. Horton, Inc. —Miske Meadows—Interim Use Permit <br /> 1. Once the use is not needed and bisemous is removed, the soils must be adequately <br /> de-compacted. <br /> Case #CR 18-05 Enerkem, Inc. —Concept Review <br /> 1. Stormwater management requirements must be met as listed in Ordinance Sec. 78- <br /> 503. - Stormwater and urban runoff control. and Sec. 78-504. -Post <br /> construction stormwater management for proposed new or redeveloped <br /> impervious surfaces. <br /> https://library.municode.com/mn/elk river/codes/code of ordinances?nodeld=COOR <br /> CH78UT ARTVSTUT DIV3STMA S78-504POCOSTMA <br /> P 0W E R I D 8 r <br /> NAYUREJ <br />