Laserfiche WebLink
Case #CU 18-19 ResCareMN—Conditional Use Permit <br /> 1. This property is located within the Shoreland Management area located near <br /> Lake Orono. Impervious surface coverage on this parcel may not exceed 25 <br /> percent of the lot area. Any additional proposed hardcover would be required to <br /> meet this restriction. <br /> Case #IU 18-01 D.R. Horton, Inc. —Miske Meadows—Interim Use Permit <br /> 1. No concerns or issues with the application as proposed. <br /> Case #CR 18-05 Enerkem, Inc. — Concept Review <br /> 1. This proposal would provide an option to continue to dispose of municipal solid <br /> waste (MSS in a sustainable manner if GRE were to stop operation in Elk River. Enerkem <br /> proposes to be able to process 250,000 short tons of RDF annually, the same that is <br /> currently being produced by GRE's resource processing plant. GRE's current capacity is <br /> 320,000 tons annually but they historically have only received about 260,000 tons. <br /> This project would need to meet all MPCA standards for waste disposal, air quality,water <br /> quality and others. An Environmental Assessment would likely be needed. Changing waste <br /> streams and fluctuating amounts of waste would need to be considered given current market <br /> trends and waste disposal restrictions. <br /> N:\Departments\Community Development\Planning\Case Files\CUP\CU 18-18 Anderson\4-Planning Commission\SPR <br /> Memo Environmental November.docx <br />